Logo HyperlocaliseLogo Hyperlocalise
Tải Iris
Integrations
Bitbucket

Keep Bitbucket locale files in step with your translations

Sync Bitbucket Cloud locale files with your projects and get translations back as a pull request.

Xem cách bản địa hóa được thực hiện trong các pull request.Bitbucket setup guide

Connect Bitbucket Cloud once for your workspace, then choose a repository in any project's Sync settings. Hyperlocalise pulls the source language files from the branch you choose.

Approved translations go back as one pull request per sync, written in the same file shapes and language codes your repository already uses.

Cách hoạt động

  1. 01

    Source file changes on Bitbucket

  2. 02

    Hyperlocalise syncs the project

  3. 03

    Translations open a pull request

Những gì bạn nhận được

Repository file sync

Pull source language files from a Bitbucket branch into a project, on demand or on a schedule.

Translation pull requests

Send approved translations back as one pull request per sync, in the repository's own file shapes.

One workspace connection

An admin connects Bitbucket once, and scheduled syncs keep running without anyone signed in.

Bắt đầu

  1. 01

    Connect Bitbucket

    An admin signs in to Bitbucket once from workspace Integrations.
  2. 02

    Choose a repository

    In a project's Sync settings, pick the repository, branch and where each language's files live.

Câu hỏi

Which Bitbucket does this work with?
Bitbucket Cloud. An admin connects it once for the whole workspace, and every project sync uses that connection.
How do translations get back into the repository?
Each sync sends approved translations as one pull request from its own branch. Only text that changed goes, and your reviewers merge it as usual.
What can the sync reach?
The repositories the connected Bitbucket account can see. Connect with an account that belongs only to the repositories you want to sync.

Xem thử trong một quy trình bản địa hóa thực tế

Yêu cầu bản demo để xem Bitbucket trong quy trình bản địa hóa với người đánh giá và các bước kiểm tra trước khi ra mắt.